Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

JCO criticality accident termination operation

Kanamori, Masashi

JNC TN8440 2001-018, 50 Pages, 2001/12

JNC-TN8440-2001-018.pdf:1.31MB

On September 30 at around 10:35 AM, criticality accident occurred at the JCO's conversion building in Tokai-mura. Since criticality accident had not been anticipated, neither devices for termination of criticality accident nor neutron detectors were available. Immediately after the information of the accident, our emergency staff (Japan Nuclear cycle development institute staff) went to JCO site, to measure the intensity of neutrons and gammas. There were four main tasks, first one was to measure the radiation intensity, second one was to terminate the criticality accident, third one is to alert the residents surrounding the JCO site, fourth one is to evacuate the employees in the site. These tasks were successfully performed until October 1. This paper describes about how these operations were performed by the relevant staffs.

Oral presentation

Development of plastic enclosure tents for body contamination

Aita, Takahiro; Hirano, Hiroshi*; Kimura, Yasuhisa; Shibanuma, Tomohiro; Yoshida, Masato; Nagai, Yuya; Asakawa, Jun; Shuji, Yoshiyuki

no journal, , 

The newly developed Plastic enclosure tents have reliable airtightness and can be set up in a short time with the small number of persons. Also, in order to prevent the spread of contamination, the exhaust device secures the internal airflow line, and the radiation management device measures the concentration of radioactive materials in the air are in real time. Furthermore, by setting up a multiple of evacuation routes, the decontamination time is shortened even when there are many contaminated persons. Therefore, it is possible to quickly evacuate the contaminated person by having both radiation safety and setting up that can quickly respond to a large-scale body contamination accident.

Oral presentation

Improvement of the decontamination detergents and methods for body radioactive contamination, 2; Evaluation of residual locations after decontamination and spread of contamination by dequiping of protective equipments

Fujisawa, Makoto; Tomioka, Akifumi; Izaki, Kenji; Shioya, Satoshi

no journal, , 

It is important to predict the spread of radioactive materials attached to workers' bodies. We evaluated the degree to which contamination remained after wiping off protective gear and the degree to which contamination was dispersed when it was removed. In the test, we applied fluorescent paint that simulates radioactive substances to protective gear, wiped it off with a wet rag, and removed the gear. And we photographed the fluorescent paint with a camera and evaluated the decontamination effect of wiping and the spread of simulated contamination. As a result of the test, we were able to evaluate the degree to which the protective gear was contaminated.

Patent

接続テント及び接続テントの組立方法

平野 宏志; 木村 泰久; 柴沼 智博; 會田 貴洋; 永井 佑哉; 浅川 潤; 吉田 将冬; 周治 愛之

南 明則*

JP, 2019-238397  Patent licensing information  Patent publication (In Japanese)

【課題】迅速に組み立て可能な接続テントを提供する。 【解決手段】接続テント(1)は、一対の第1側面フレーム(11、12)及び第1天面フレーム(13)を有する門型フレーム(10)と、第2側面フレーム(21)及び第2天面フレーム(22)を有するL型フレーム(20)と、門型フレーム(10)及びL型フレーム(20)で囲まれた内部空間に収容可能であり、開閉可能な複数の出入口が側面に形成された箱型の部屋テントとを備え、複数の出入口それぞれは、門型フレーム(10)及びL型フレーム(20)の側面に形成された複数の開口のいずれかに対面している。

4 (Records 1-4 displayed on this page)
  • 1